TIGER Hackathon drives innovation for Abrams
By DEANNE MAZZOLA
U.S. Army Contracting Command-Detroit Arsenal
and ANN ZANIEWSKI
TACOM Public Affairs
DETROIT ARSENAL, Mich. — More than 40 industry vendors convened July 14 at the Detroit Arsenal for the Total Integrated Engine Revitalization (TIGER) Hackathon, a collaborative event focused on enhancing supply chain resilience and advanced manufacturing for the Automotive Gas Turbine 1500 Engine, part of the powertrain for the Abrams platform.
The hackathon’s primary mission was to identify innovative solutions to resolve critical sourcing and manufacturing bottlenecks, ultimately increasing and maintaining operational readiness for the Abrams fleet.
The U.S. Army Tank-automotive and Armaments Command, Integrated Logistics Support Center; Capability Program Executive-Ground Soldier Systems, Project Manager Abrams; Combat Capabilities Development Command-Ground Vehicle Systems Center; Army Contracting Command-Detroit Arsenal; and the original equipment manufacturer, Honeywell Aerospace, hosted the event.
“The momentum we had behind this was incredible,” said Phil Labut, supervisory logistics management specialist at the ILSC.
“Proactive, outside-of-the-box (approaches) like this, like the hackathon, are exactly what we need in the Army right now to ensure we remain the best equipped and the most capable force in the world.”
The event featured 34 one-on-one sessions between industry partners and government subject matter experts. Briefings and collaborative discussions centered around three core objectives:
• Traditional second source: Establishing reliable, secondary manufacturing and supply lines for critical components using traditional production methods.
• Advanced manufacturing: Leveraging cutting-edge manufacturing technologies to rapidly produce 166 critical and single source components impacted by supply chain constraints.
• Material provision: Securing critical raw materials, forgings, castings and structural elements to accelerate the overall production cycle.
Brandon Pender, associate director, DEVCOM GVSC, said most of the attendees represented non-traditional companies. Commercial vendors participated, as well.
“We looked at a problem, and we’re approaching it with a faster, more transparent pathway using innovative companies to solve this problem,” he said.
One major highlight was a physical display of two AGT1500 engines and some of the critical components. Vendors were able to conduct hands-on inspections and engage directly with technical experts from ILSC, PM Abrams and GVSC.
Morning briefings included a session on supplier requirements led by Honeywell Aerospace. The afternoon featured intensive, one-on-one matchmaking and strategy meetings between representatives from industry and the Army.
Organizers said the successful turnout marked a significant step forward in securing the supply chain for one of the military's most essential combat platforms.
“It went over really well with industry, and it helped us just understand some of the capability that’s out there,” said Rick Harris, Stryker/ISV division chief, ACC-Detroit Arsenal.
Labut said the collaboration and innovation that led to the hackathon could be a model for similar future events.
“This aggressive, data-driven approach to resolving sustainment bottlenecks can easily serve as a blueprint, I think, to secure and strengthen supply chains for other major defense systems across the Army,” he said.
He also said, “Bottom line: Everything we do is focused on the Soldier and the warfighter. By proactively expanding our industrial base and building some of these supply chain redundancies, we ensure the Abrams platform remains fully mission capable for the warfighter.”
Following the success of the hackathon, the Army initiated the second phase of its Area of Interest for TIGER Readiness under the Ground Maneuver Commercial Solutions Opening. The AoI invites companies to submit proposals detailing how they would provide innovative solutions that would resolve the critical sourcing and manufacturing bottleneck.